Alorie · Services · Technical planning

Service 04

A building that
works as a hotel.

An architect designs a building; someone else has to run one. Between the two sits a written brief, a set of standards, and a person checking week by week that what is being built matches what the operation will need on the day it opens.

  • 484Units at The Manor, opened 2023
  • 9Towers planned at The Sail, Melaka
  • 2011Working with owners since
A resort under construction on a coastal site at sunset, a tower crane standing over the concrete frame
From drawings to handover

The brief comes before the drawings

Technical services start with a hotel brief: a written statement, for the project architects and every other consultant, of what the building has to do. How many keys and of what size. How a guest arrives, checks in and finds a lift. Where the kitchens sit in relation to the outlets they serve. How linen, refuse and deliveries move through the building without ever crossing a guest.

From the brief come the design guidelines and the technical standards the project is drawn to. They are unglamorous documents, and they set the operating cost of the hotel for the next thirty years.

A mistake in the drawings is cheap to correct, expensive to build and permanent to own.

We work alongside the project manager, the architect, the designers and the consultants, and we stay on the project through design and construction rather than arriving at handover. A standard is only worth setting while there is still time to hold someone to it.

What technical services cover

Six pieces of work, each of them written down and handed over.

The hotel brief

The operational requirement, written for the project architects and all the other consultants, and agreed before design begins in earnest.

Design guidelines and standards

What the room types, the finishes and the systems have to meet, so quality is a specification agreed at the start rather than an argument on site later.

Space planning, front and back

Every component of the hotel sized and placed: store rooms, offices and staff facilities as carefully as lobbies, restaurants and rooms.

Kitchens and food and beverage

Kitchens grouped and placed close to the outlets they serve, storage sized properly, and a kitchen specialist selected and briefed where the plan needs one.

Monitoring through design and build

Reviewing the drawings, and then the site, against the brief and the standards — while a change still costs a revision rather than a demolition.

Handover into pre-opening

Where the technical work becomes an opening: pre-opening and manning budgets, working capital guidelines, and a five to ten year forecast to run against.

A typical technical mandate

Scope moves with the project. This is the shape most of them take.

Begins
At concept, before the architects are appointed, or as soon after that as the owner can manage.
First deliverable
The hotel brief, with the design guidelines and technical standards behind it.
Through design
Drawing reviews against the brief, and a hand in selecting and contracting the consultants the project still needs.
Through construction
Monitoring the standards of product and service on site, for the whole duration of the build rather than at milestones.
Ends
At handover, with the pre-opening and manning budgets, the working capital guidelines and a five to ten year forecast in the owner's hands.

Procurement, and what it is for

Buying a hotel's furniture, fittings and operating equipment is the point at which a design either survives or is quietly value-engineered away. Most owners would rather run procurement themselves, so our first job is to make that possible: product standards and guidelines written down, and price relationships monitored against them.

Where an owner wants us to run it, we do. We specify the furniture, fixtures and equipment and the operating supplies against the standards set in design, negotiate supplier agreements on the owner's behalf, and consolidate orders across a project or a portfolio where the volume earns a better price. Web-based purchasing handles most of the routine.

The point is not only the price. Every hour a general manager spends negotiating with suppliers is an hour not spent running the hotel, and loosely handled supplier relationships are where misunderstandings begin.

Light on the land

Sustainability is a design decision long before it is an operating one. Most of what a hotel will consume for the rest of its life is fixed by the time the drawings are signed, so we plan for it in the brief rather than retrofitting it after the first electricity bill.

  • Water planned as a system: consumption designed down, waste water dealt with, and reuse considered while it is still a line on a drawing.
  • Energy planned to the site: the loads a building of that shape in that climate will actually carry, and renewable supply where it pays for itself.
  • Waste handled properly: reduced, separated and reused, with composting on resort and upcountry sites where it makes sense.
  • Local sourcing: local suppliers and local produce where the quality is there, and materials chosen for what they are made of.
  • Certification pursued where it counts: we will help an owner meet a standard the market rewards, and say so when the budget would be better spent elsewhere.

Where an owner wants it carried into operation, the property gets a written action plan and one measurable target inside its business plan, reviewed like every other line in it.

Three buildings we worked on

Different scopes, the same job: making sure the building could be run.

The Manor, Kuala Lumpur

A 47-storey branded serviced residence on Persiaran Stonor, among the embassies. Alorie shaped the concept, gave technical assistance, built the pre-opening operation and stayed on as manager.

  • 484 units and two penthouses
  • Opened 2023
  • Infinity pool, rooftop restaurant, 24-hour concierge

The Sail, Melaka

A mixed development planned around nine podium-top towers and a sky ring. Alorie gave technical planning assistance; the project was taken to planning.

  • Nine podium-top towers
  • Planned with the longest rooftop pool in Melaka
  • Mall, sky garden and the Melaka Cultural Village

Novo, Ampang

A 38-storey serviced-residence tower in Ampang, Kuala Lumpur. Alorie gave technical assistance and the feasibility work behind it.

  • 38 storeys
  • Sky pool, sky bar and mini-theatre
  • Opened end 2023

Tell us about
the asset.

One email is enough: where the property is, what stage it is at, and what you need. We read every enquiry ourselves and reply personally.